Who gets the trade rate
A contractor sees contractor pricing. A walk-in does not.
Rate per bag, per sheet, per foot — with your trade price for the people who get a trade price, and a delivery that is actually loaded.
Four seconds, from your own stock and your own prices — at whatever hour it arrived.
A contractor sees contractor pricing. A walk-in does not.
50 bags is not 50 times the price of one, and the quote knows that.
Deliveries go where the last one went, unless told otherwise.
Written for your trade and filed with Meta once. After that they go out with one tap.
{{name}}: {{item}} x {{qty}} at ₹{{rate}} = ₹{{amount}}. Holds till {{day}}.
11:04
Your load left at {{time}}, {{name}}. {{driver}} — {{phone}}. Reaching site by {{eta}}.
11:04We set it up with you, on your own number, and stay on the phone until it is answering properly. ₹999 a month after that.